Failure to install conduits for concealed wiring during roof slab casting. Author: Engr. Dibakar Dey, IIT-Kharagpur, India

Text size A A A
Color C C C C

Failure to install concealed wiring conduits during the roof slab casting:

1. Placing pipes for concealed wiring over the roof reinforcement (rebar) after it has been tied can lead to cracks in the roof slab. In reality, if concealed wiring is to be installed within a roof slab, the slab thickness should be increased based on technical calculations.

2. Cracks are appearing in many roofs due to a mismatch between the properties of modern, high-quality cement, high-grade steel reinforcement, and the rising temperatures caused by changing weather conditions.

3. The more wiring conduits you embed within a roof slab, the more its continuity and uniformity are compromised. This inevitably leads to a disproportionate imbalance between tensile and compressive elasticity. Furthermore, the impact of temperature fluctuations due to weather conditions comes into play; the specific heat and elasticity of the steel reinforcement (rebar) and the PVC piping material are not the same. Consequently, the internal stresses generated by these factors make the development of cracks highly likely.

4. These cracks may become visible as early as 3 months after the roof is cast, or they might not appear until 13 years later.

5. In reality, only one conduit (pipe) is needed in the ceiling specifically for the ceiling fan. However, electricians often route all the conduits those intended to connect one wall to the opposite wall through the ceiling. This leads to an excessive number of conduits in the ceiling, which is precisely what causes problems!

6. The area near the distribution board (DB box), where many conduits converge, poses the greatest risk. Because of these clusters of conduits, cracks often originate in such spots and then propagate along the paths of the conduits.

 

So, what should you do?

1. For the ceiling, use a single, very narrow pipe (a size even smaller than half an inch) for the fan point. This pipe should run from one wall to the fan hook—position it so that it extends from a corner of the room to the fan point.

Do not lay the pipe parallel to a beam, and do not extend it all the way to the opposite wall. Under no circumstances should a roof slab be bisected or cut through by any pipe.

2. For the remaining pipes, cut through the walls to route them; however, do not cut into any columns!

3. The most practical approach is to add a 3-inch layer of concrete (without reinforcement bars) over the lintel and route the concealed wiring pipes through it.

4. For the ground floor, you may route the pipes through the rough concrete layer (base concrete) of the floor.

5. In cases where it is unavoidable to run pipes through the roof, route them through the beams rather than the roof slab itself. Ensure that the pipes are placed outside the reinforcement cage either along the exterior or within the concrete cover zone rather than passing through the steel reinforcement. For column-supported structures with large spans, do not route pipes through the load-bearing beams.

6. Do not install any pipes in roof slabs that are only 3 inches thick. Furthermore, do not run any pipes through the topmost (final) roof slab of the building.

7. After installing pipes in the walls, take photographs of every wall before the plastering (rendering) process begins. This will provide a record of the concealed pipe routes, which is helpful if you ever need to drill into the walls later ensuring that a drill bit does not accidentally puncture any of the concealed pipes.

8. Electricians or masons may try to persuade you to follow certain methods for their own convenience; therefore, ensure that all work is carried out under the supervision of an engineer.

9. In terms of maintaining the structural integrity of the ceiling, the wisest approach is to use a 'capping-casing' (surface-mounted) wiring system; however, this method is not aesthetically pleasing.

 

 

 

 

Department: